จำหน่าย ออกแบบ เขียนแบบ ติดตั้ง งานระบบไฟฟ้า หาดใหญ่ สงขลา - เอ็ม.อี.อี.ซีสเต็มแอนด์ซัพพลาย

TTM ONSHORE NON-PIGGABLE PIPELINES CORROSION ASSESSMENT YEAR 2025

by meesystem @8 ก.ย. 68 18:40 ( IP : 125...183 ) | Tags : Actions - กิจกรรม
  • photo  , 960x640 pixel , 95,382 bytes.
  • photo  , 960x720 pixel , 90,625 bytes.
  • photo  , 960x720 pixel , 88,187 bytes.
  • photo  , 960x720 pixel , 87,529 bytes.
  • photo  , 960x720 pixel , 73,847 bytes.
  • photo  , 960x1280 pixel , 258,931 bytes.
  • photo  , 960x1280 pixel , 335,705 bytes.
  • photo  , 960x1280 pixel , 259,469 bytes.
  • photo  , 960x1280 pixel , 189,615 bytes.
  • photo  , 960x1280 pixel , 155,992 bytes.
  • photo  , 960x1280 pixel , 177,908 bytes.
  • photo  , 960x1280 pixel , 163,864 bytes.
  • photo  , 960x1280 pixel , 198,132 bytes.
  • photo  , 960x720 pixel , 104,085 bytes.
  • photo  , 960x720 pixel , 172,367 bytes.
  • photo  , 960x1280 pixel , 294,120 bytes.
  • photo  , 960x1280 pixel , 197,545 bytes.
  • photo  , 960x1280 pixel , 174,623 bytes.
  • photo  , 960x720 pixel , 135,288 bytes.
  • photo  , 960x720 pixel , 149,847 bytes.
  • photo  , 960x1280 pixel , 181,039 bytes.
  • photo  , 960x1707 pixel , 317,725 bytes.
  • photo  , 960x720 pixel , 94,663 bytes.
  • photo  , 960x1280 pixel , 250,385 bytes.
  • photo  , 960x720 pixel , 149,607 bytes.
  • photo  , 960x1280 pixel , 229,304 bytes.
  • photo  , 960x720 pixel , 115,478 bytes.
  • photo  , 960x720 pixel , 89,847 bytes.
  • photo  , 960x640 pixel , 99,683 bytes.
  • photo  , 960x1707 pixel , 317,725 bytes.
  • photo  , 960x720 pixel , 94,663 bytes.
  • photo  , 960x1280 pixel , 250,385 bytes.
  • photo  , 960x720 pixel , 149,607 bytes.
  • photo  , 960x1280 pixel , 229,304 bytes.
  • photo  , 960x720 pixel , 115,478 bytes.
  • photo  , 960x720 pixel , 89,847 bytes.
  • photo  , 960x640 pixel , 99,683 bytes.

1.Both ICDA and ECDA, the excavation for corrosion measurement requires     a).One (1) location for NPS34 TGBP,     b) One (1) Location for NPS 8"     c) One (1) Location for Underground Pipe 6”     d) Therefore, the total of excavation is three (3) locations for two (2) pipelines and one (1) pipe     e) The pipeline NPS16 is not required excavation to direct assessment due to it has been installed via HDD process, resulting to the excavation for inspection is impractical     f) Soil Sampling to collected from 3 location (NPS 34 TGBP, NPS8 and Pipe 6”) 2.In case of some pipeline specified excavation point based on analysis is not applicable, the option changing to possible excavation point is acceptable subjected to TTM approval 3.Re-coating (exceptional for concrete coating) as per original design specification shall be performed upon completion of the physical measurement 4.Provide a comprehensive health, safety, and environment (HSE) plan 5.Propose a detailed project timeline 6.The coating removal and repair works shall be performed under the direction of a qualified coating inspection NACE certified minimum level 1 7.Test certificates / reports shall be approved by a qualified corrosion engineer NACE CP certified minimum level 3

แสดงความคิดเห็น

« 3514
หากท่านไม่ได้เป็นสมาชิก ท่านจำเป็นต้องป้อนตัวอักษรของ Anti-spam word ในช่องข้างบนให้ถูกต้อง
The content of this field is kept private and will not be shown publicly. This mail use for contact via email when someone want to contact you.
Bold Italic Underline Left Center Right Ordered List Bulleted List Horizontal Rule Page break Hyperlink Text Color :) Quote
คำแนะนำ เว็บไซท์นี้สามารถเขียนข้อความในรูปแบบ มาร์คดาวน์ - Markdown Syntax:
  • วิธีการขึ้นบรรทัดใหม่โดยไม่เว้นช่องว่างระหว่างบรรทัด ให้เคาะเว้นวรรค (Space bar) ที่ท้ายบรรทัดจำนวนหนึ่งครั้ง
  • วิธีการขึ้นย่อหน้าใหม่ซึ่งจะมีการเว้นช่องว่างห่างจากบรรทัดด้านบนเล็กน้อย ให้เคาะ Enter จำนวน 2 ครั้ง